Bolivia

Acts 13:2

Drills, Hammers, Ladders, and HTML

Posted By on October 12, 2010

Well I have been working hard here at the construction site. I finished most of the conduit and now they have put me on putting up the drop celling. After spending years crawling around in it at the Hospital in Sonora, I finally get the joys of putting it up. It is actually pretty fun. First you run a wall piece around the whole room. We are using a lazer leveler to make sure it is level. Then we attach hanger wire to hold up the main runs. Then you set up the main runs and connect them with the t-connectors. It took me a while to figure out the names. But Ed made sure that I knew the names….

Ed left last night and we were able to slow the rush a little bit, which gave us all a must needed rest. I can’t believe I will be headed home in only 2 more weeks. It is exciting, but a really weird feeling. I can’t quite explain it. I really want to head home and take a break but at the same time I am really going to miss all the people and things going on around here.

With all this construction work, I got a surprising side job. Richard, the leader of Red ADvenir, found out that I wrote websites. They were in desperate need of a new site and he asked me if I could write one for him. So I have been writing this site after work. It’s kind of refreshing after a hard day of manual labor. Well it has been a busy week and I am going to get ready to go to bed.

Thanks for all of you who take the time to read this.

God Bless!!!

Josh


Comments

Leave a Reply